Week Three: Painting 95% done!
Tuesday, July 29th, 2014- Dining room done! Hope we don’t have to take out the ceiling for the joist reinforcement!
- Kitchen is almost finished!
- Living room done!
- Patio entrance done!
- Hallway/closet done! Except for the ceiling
- Half bath done!
- Kitchen looking into dining room!
- Stairwell done!
- Entrance door done!
- Upper hallway closets done!
- Hallway done!
- 3rd level stairwell done!
- Hallway done!
- Doors done!
- BR 2 done except for the HW heat covers
- BR 2 closet done!
- MB done except for the HW heat covers!
- MB closet done!
- Main bath done!
- Tub surround is almost sparkling!
- Calcium, Lime and Rust gone!
- A little more elbow grease is needed to clean the grout!
- Remember all the rust stains? Like new!
Well, it looks and smells sooooo good in this unit now. All the stale odors are covered with fresh paint…every square inch, including ceilings! I always think when doing a renovation the most dramatic change is when the painting is done! It makes a place feel new!
The structural engineer came today to review our sagging joists. The news is likely the best we could hope for. He has concluded it was likely caused from the original build. The remediation we think will be fairly simple. But the engineer had to consult with another colleague for what actually needs to be done to repair/reinforce it. Hopefully we will have an answer later this week.
In the meantime we can proceed with flooring the upper level and doing our finishing upstairs! WAHOOO!!!
Our original target date for completion was August 1st. I’m speculating if the joist remediation doesn’t take too long, maybe August 15th!