Day Four: TSP is my new friend!
Well, we accomplished a lot today as well. A good thing, as we both have to go to work tomorrow!
We have successfully removed the flooring in the main bathroom. This was a 3 person job and took many tools and a lot of muscle! The last of the flooring in the upstairs is in a small storage room and it is almost completely gone too. The staples were the hardest to pull up!!
All the walls which had wall paper have now been treated with TSP. My new friend! Boy does that stuff cut through grime, glue and guck! I also did the main bath.
I cleaned out a storage closet which had lots of items left behind, a few treasures which we are using. Check out the classy lamp in the photos! Also left was some dishes and cutlery, lots of boxes which went straight to recycle, and phones, speaker stands etc. Most of it went into the “bin”!
Tomorrow we have the flooring being delivered and the plumber coming.
We have discovered some sagging beams which are cracked. So I’ll be on the phone to the property manager in the morning!