The end of week four!
Progress is a beautiful thing!
This week the flooring is finished as far as we can go for now! Its is done from the top of the unit right down to the main level concrete floor.
All the baseboard heater covers have been scrubbed, sanded and freshly painted!
The cabinets are installed and waiting for counter tops. Counter tops have been ordered.
We had to pull off the tile surrounding the tub to fix the leaking tub taps! So there is an added expense we didn’t anticipate. However the upside is the tiling around the tub will be brand new and look awesome!
Got some great deals on a kitchen sink through Kijiji and a kitchen faucet from Rona’s tent sale.
We are still patiently waiting to hear about the report from the structural engineer regarding our joist repair. This is holding us up from completing all the drywall and painting. We are continuing to finish the areas we can and trust it is not going to present a problem to the contractor.