Day one: Income Property Kilbank Style
-
-
Its a 1106 sf 2 bedroom 1.5 bath 2 Story apartment!
-
-
Book shelves attached to the wall with about 100 plugs and 50 brackets!
-
-
Unique corner book shelf
-
-
Count those brackes
-
-
Wall paper removal project
-
-
More wall paper removal
-
-
Panelling is “precious”
-
-
The dust on this light fixtures was thick
-
-
Galley kitchen has potential
-
-
Leak in ceiling in kitchen must be fixed
-
-
Pantry off the kitchen has a pencil sharpener attached to a shelf!
-
-
Half bath is dark and dated.
-
-
Check out the 60’s vintage medicine cabinet
-
-
Light bulbs so small they don’t shed much light!
-
-
More ceiling repair in the hallway
-
-
Closet doors missing
-
-
Gross carpet in stairwells
-
-
Lots of water stains on walls and ceilings in the hallways!
-
-
Laminate flooring has to go!
-
-
Peel and stick tile…tacky (pun intended)
-
-
Check out these transitions
-
-
Large linen closet in upper hallway! BONUS!
-
-
Light fixture filled with water! YIKES
-
-
Stains in ceiling in upper hallway
-
-
The bath has some issues!
-
-
New vanity, lighting mirror required.
-
-
More weird lighting in the hallway
-
-
Now this is precious,…. a mix of the panelling and wallpaper!
-
-
Bedroom 2 check out the border!
-
-
Good size closets a must!
-
-
New windows!!
-
-
Master bedroom is the best in the home but still needs updating
-
-
New floors and paint and baseboards are on the “to do” list.
-
-
Good size room though!
-
-
Check out this unique shelving in the main bath
-
-
Dining area has great natural light!
-
-
More ceiling repair!
-
-
Nice maple cabinets need to be TWEEKED!
-
-
Sigranit sink has potential!
We bought a condo!!! Yes, we secured a foreclosure and although the possession date is today, our work started several weeks ago!
For the next few weeks, I will chronicle our renovation experiences and you can follow our progress!
So prior to today, I have been busy arranging insurance, utilities, and securing product. Our goal is to be done in 3 weeks.
We got a late start as we were to have possession originally on July 2, but there was a little back and forth with lawyers and today we finally closed.
I have ordered cabinets, bought bathroom vanity for upstairs. The Home Depot had dual flush toilets on sale, so they are sitting in my living room! I’ve picked out the backsplash tile, flooring. Got some deals at Restore on some bathroom vanity sinks. Also caught some deals at Park Lighting just today!
We got possession late in the day today, but we were able to get some demo done this evening.
The dumpster arrives tomorrow!
Its a 1106 sf 2 bedroom 1.5 bath 2 Story apartment!
This entry was posted
on Friday, July 11th, 2014 at 6:08 am and is filed under Uncategorized.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.